Anode Tripods

JOTNE MEKANISKE VERKSTEDER AS

Anode Tripods

ABOUT THE PROJECT

Jotne E&P AS has completed THE FABRICATION OF ANODE TRIPODS AND ASSOCIATED EQUIPMENT on time and STATOIL has successfully installed them at the SHERINGHAM SHOAL WINDMILL FARM on 88 windmills and 2 substations.

The project was a fast-track project started in the beginning of February 2014 and delivered end of June 2014.

The elements delivered were:

- 2848 anodes including tripod structure for each of them , total weight approximately 900 kgs each

- Wires enabling to install sets of 8 anode tripods each lift

- Cables for interconnecting the Anode Tripods and connection to the 88 Windmills + 2 substations

- 10 transport frames with a capacity of 48 Anode Tripods each to enable assembly of wires & cables and transport by the installation vessel.

The production was distributed in the following places:

- Structures were in Poland

- The anodes in UK

- Transport frames in Lithuania

- Wires & cables in Norway and

- Final Assembly at Jotne Mekaniske Verksteder AS

DETAILED INFO
Fabrication of Anode Tripods and associated equipment.